Performance Improvement Study

Country:
Netherlands
Location:
BEC, Cuijk
Fuel Type:
Energy From Waste

Key Challenges

RJM was invited to review all aspects of combustion and emissions performance at this 80MWth bubbling fluidised bed generator by a financial institution seeking to optimise its investment. The plant was unable to meet its emissions limits on CO, NOx and dust at full load and was experiencing fuel blockages. Consequently, revenue was below plan.

RJM Solution

RJM introduced a series of changes to operational procedures including the re-distribution of combustion air between ports, modifications to control curves and a full CFD study to map the complex interaction between fuel particles and air jets from the secondary and tertiary air ports.

Results

Following the introduction of these various modifications, plant performance and reliability improved, with significantly reduced downtime, improved revenues and emissions compliance was restored


    Australian flag
    AGL Bayswater, New South Wales

    Innovative NOx reduction solution

    Coal
    View Project
    Tanjung Bin 4, Johor

    Performance improvement project

    Coal
    View Project
    Northeast Utilities, Schiller Unit 6, New Hampshire

    NOx reduction project to meet Phase 1 RACT regulations

    Coal
    View Project
    Chalk Point 3 & 4, Maryland

    Burner modifications to reduce NOx and opacity

    Oil
    View Project
    Northeast Utilities, Norwalk Harbor

    Engineer, model and supply new NOx reduction system

    Oil
    View Project