Return to service study
Key Challenges
To identify what works needed to be done to return this 22MW biomass site firing waste wood to return to generation after a lengthy period out of service.
RJM Solution
RJM’s engineers proposed to carry out a full review of every aspect of the plant’s operations, from materials handling, instrumentation review, baseline testing, fuel review, through to combustion and emissions. The study was broken up into five phases, over a compressed, 24 week period.
• Immediate Pre-Return to Service (RTS) works
• Secondary Pre-RTS works
• Return to Service
• Post-RTS Optimisation
• Improvement works.
Northeast Utilities, Schiller Unit 6, New Hampshire
NOx reduction project to meet Phase 1 RACT regulations
Coal
View Project
Northeast Utilities, Norwalk Harbor
Engineer, model and supply new NOx reduction system
Oil
View Project