Proven Performance: Plant firing waste wood in the UK
In 2024, RJM installed eleven IMPULSE® units at a waste wood gasification plant in the UK, followed by a further five units in 2025. The results delivered a step-change in operational performance:
-
1 MWe increase in net power output.
-
5% improvement in gasifier availability.
-
19 additional days of generation per annum.
-
Record-breaking run of 140 continuous days of operation.


